This project is the second phase of the Catalina improvement plan that began last year with the watermain lining. This phase will see work done on both the local watermains and storm sewers as both systems are upgraded to better meet the needs of local residents. Unlike the lining work performed in 2023, the water and sewer mains will be fully replaced. As a result, there will be greater impacts to local traffic as work is conducted in the roads, but affected residents will not need to be placed on a temporary water service system. Crews will begin mobilizing in early April, with work to begin shortly thereafter. This year’s efforts will focus on the western portion of the Catalina neighborhood while the remaining eastern portion is scheduled to be finished in 2025.
Temporary asphalt patching will be put over the affected roadways at the end of this year’s project while more extensive road resurfacing will take place during 2025 as part of the Village’s Road Improvement Program.
UPDATE (11/5/24): Crews have finished all work related to the new watermain and have also finished the new detention basin near Veteran’s Park. After several weeks of delays due to unforeseen underground conditions, Airy’s will be back on site on November 11th to resume work on the new 48” storm sewer.
In order to complete this job safely and efficiently, a portion of Wheeler Drive between Primrose Lane and Hemlock Drive will be temporarily closed to all through traffic while work is ongoing. This closure will begin on November 11th and is expected to last for two weeks. Residents who live within the work zone as well as mail, school buses, trash pickup, emergency vehicles, etc., will all be accommodated to pass through as needed, but all other traffic will be directed to follow the posted detours.
After the sewer has been installed, all outstanding asphalt, concrete, and landscape restoration work will be completed as well. We also want to assure residents that, even in the event of further unforeseen delays to work, we will ensure that all roadways are restored before accumulating snowfall arrives.
Resident Notification Letter
Wheeler Drive Closure Detour