Restrictions:
A permit is required for installation of all sheds. The permit fee is $150.
Maximum lot coverage is limited for each zoning district. See the
Land Development Code, Article 6, Part 2, District Regulations for complete information.
Application Requirements:
The following is needed to apply for permit:
- A completed permit application
- A recent plat of survey, showing proposed shed location, noting distance to structures and lot lines
- Contractor's information, if one is being used
- Signed copy of Shed Installation Rules and Requirements
- If shed is being built, include framing plan & materials being used
Inspections Required:
A pre-pour inspection of the base and forms is required. A final inspection is required once the work has been completed and prior to any materials being stored in the shed. Please submit an i
nspection request. Inspections are not taken over the phone.